Build and test / Desktop (Linux) (push) Successful in 21m37s
Build and test / Layer separation (push) Successful in 28s
Traceability / Requirement traces (push) Successful in 25s
🐳 Android image / Build and push (push) Successful in 1s
Build and test / android-image (push) Successful in 1s
Build and test / Android (aarch64) (push) Failing after 44m27s
Master moved 24 commits while this branch was building the face sweep, and one of them changed how the interface reaches a server: `remote.rs` is now the only file that names a connector, and everything else takes `&dyn RemoteBackend`. The face sweep was written before that landed and built a `NextcloudBackend` directly. Git merged the text without complaint and the result did not compile, which is the useful kind of conflict — it goes through `remote::connect` now, like every other pass. Two documentation conflicts, both resolved toward master. `code-health.md` was an add/add: master's copy carries the CH resolution for the backend seam and a better provenance note, so it wins outright, with its measured figures re-taken against the merged tree rather than either side's — `run()` is 1,855 lines now, 2,042 tests, 793 traceability tags. `traceability.md` is generated, so it was regenerated rather than hand-merged. The seam grades in code-health.md are unchanged by this merge. That is worth noticing rather than glossing: the face work went into the seams that already existed — `run()`, `library.rs`, `AppWindow` — which is exactly the pressure CH-1 describes rather than evidence against it. All four CI jobs pass: desktop (fmt, clippy, test, build), layering, traceability, and the Android cross-build. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>