D12 had been OPEN since the 2026-08-08 calibration, and D3 said it
depended on D12. In the meantime the milestone D3 named was delivered
and closed on 2026-08-30 and the application reached 0.12.2 with every
cluster the calibration selected at least begun. The decision the
register was waiting for had been made by building, so the register
now says so: full scope stands, v1 has no date, and "post-v1" in §7 is
the one way a clause leaves the count.
The status line also stops calling this a draft from August; it has
carried eleven dated amendments since.