dtourolle f6653e6a8b ci(security): add a supply-chain gate, checksums and an SBOM
The project shipped signed Android builds and unsigned desktop binaries
with no vulnerability scanning of any kind. Nothing checked the ~500
crate Rust graph or the JS packages against an advisory feed, and nothing
checked that what we redistribute inside an MIT bundle permits it.

The first cargo-deny run found eight vulnerabilities and one
unsoundness -- bytes, four in rustls-webpki, time, two in quick-xml and
rand -- every one of them closed by a `cargo update` nobody had a reason
to run. That update is in this commit; 740 Rust tests and clippy
-D warnings pass on the new lockfile.

Two structural fixes matter as much as the gate itself:

  - deny.toml scopes the graph to the targets we actually ship. Without
    it the Apple targets pull in plist -> quick-xml and report two DoS
    advisories against a crate that is in no binary we release. Ignoring
    those by ID would silence them everywhere, including where they
    would matter; scoping makes them correctly absent.

  - libmpv is pinned by rev instead of branch = "master". A branch means
    the revision is whatever Cargo.lock happens to hold and any
    `cargo update` silently substitutes new upstream code -- in the one
    dependency that is not from crates.io and that links a C library
    into the player. The rev is the commit already locked, so this pins
    current behaviour rather than changing it.

Licence findings are recorded rather than waved through. libmpv and
libmpv-sys are LGPL-2.1, satisfied here by dynamic linking against the
system library; deny.toml carries the two obligations that follow (keep
the linkage dynamic, ship libmpv's licence text with any bundle carrying
the .so). MPL-2.0 crates are file-level copyleft and fine unmodified.

Releases now publish SHA256SUMS (verified in-job with `sha256sum -c`
before upload) and a CycloneDX SBOM for both halves, so "does this
release contain <vulnerable crate>?" has an answer that is not "rebuild
the tag and re-resolve it".

Workflows pin jellytau-builder:2026.08 instead of :latest. While every
job said :latest, rebuilding the image changed what every build compiled
against, including rebuilds of old release tags.

Also folded in, because both were the same class of problem:

  - publish-docs.yml downloaded mdBook from GitHub releases into
    /usr/local/bin at job time -- a toolchain install in CI, which
    CLAUDE.md explicitly forbids, and a hard dependency on GitHub's CDN
    at publish time. It is in the builder image now.

  - extract-traces.ts only ever read .ts/.svelte/.rs, so every
    requirement implemented by *configuration* was invisible to the
    matrix that measures it. DR-205, DR-206, DR-207 and DR-215 all carry
    TRACES comments nothing read, and each counted as uncovered while
    being covered. Coverage was really 90%, not 88%; MIN_THRESHOLD moves
    to 89 accordingly. CI workflows stay excluded and there is a test
    saying why: traceability-check.yml quotes "a TRACES: comment" beside
    deliberately-undefined example IDs, which the extractor would read
    as real traces and then fail its own dangling-ID check.

Supply-chain requirement is DR-216.

🔴 The builder image must be rebuilt and pushed
(scripts/build-builder-image.sh 2026.08) before this reaches master --
the workflows now name a tag and tools that do not exist in the registry
yet.
2026-08-21 18:25:38 +02:00
dtourolle 32043a2152 docs: fold shipped specs into the architecture docs and delete them
A spec was a promise; sixteen of them had become descriptions of code that
already shipped, sitting beside four that describe work still outstanding, with
nothing in the file telling the two apart. Half the statuses were also wrong —
audio-equalizer read "Accepted" with the EQ live on both platforms, the native
video spec said the flag stays off after the default was flipped on.

The shipped designs move into docs/architecture, which is the maintained
description of the build, and the spec files go. Git history keeps the
originals; what a future change still needs is carried across:

- 01-rust-backend: favourites rewritten (the old section named a file that no
  longer exists and called shipped buttons "planned"), domain vocabulary owned
  by Rust (SearchScope, exclusions, the bitrate ladder), background workers
- 02-svelte-frontend: app shell and chrome, library mosaic, series/episode
  navigation, downloaded browse, safe-area insets, native-video store, logging
- 03-data-flow: locally-indexed search
- 05-platform-backends: audio settings on ExoPlayer, the equalizer's band
  vocabulary, native video compositing, the background-audio handoff
- 06-downloads-and-offline: one storage model, offline catalog visibility
- 09-security: path confinement and input binding

docs/specs/README.md now says what the directory is for and where each shipped
design went. Deferred work the specs recorded is kept beside the code it
concerns rather than lost: season-bounded autoplay, the two dead search
commands, why indexing is a full crawl.

requirements.md had fourteen stale statuses — Android audio parity still read
"Linux only", DR-150 still said the native-video default was off, DR-190 was
Proposed after DR-196 implemented it, and five tooling requirements were
Proposed after landing. Three unbuilt specs suggested requirement ids that have
since been allocated to other work; each now carries a warning.
2026-08-21 18:15:58 +02:00
dtourolle 164157f98e chore(ci): raise the traceability ratchet from 82% to 88%
Actual coverage is 90% (`bun run traces:coverage`), so the gate had ~8 points
of slack — a requirement could stop being traced and CI would not notice.
Per the ratchet policy in the workflow, move it up to sit just under the real
figure.

MIN_COVERAGE_PERCENT in scripts/extract-traces.ts moves in lockstep: the
workflow comment says to keep the two in sync and extract-traces.test.ts
asserts it, so changing only the YAML turns the frontend suite red.

(The stale "fails below 50%" comment in scripts/test-all.sh, wrong since the
threshold moved to 82, was corrected in the preceding commit along with the
rest of that file.)
2026-08-20 19:35:38 +02:00
dtourolle b9dab56379 ci: enforce the checks the contributor rules already required
Four gates that were documented but unenforced, plus the flaky test that
made a full-suite run untrustworthy.

Rust lint/format: CLAUDE.md has required `cargo fmt` and `cargo clippy`
before every commit for as long as the rule existed, yet neither ran
anywhere in CI — the requirement rested on memory alone. Both now run in
build-and-test.yml and build-release.yml. rustfmt and clippy are already
baked into the builder image, so nothing is installed at job time.
`cargo fmt --all -- --check` is strict immediately (the tree is clean).
Clippy is advisory for now: ~51 pre-existing warnings mean `-D warnings`
would fail on unrelated work, so the step carries a TODO to flip the flag
once the backlog clears. A compile error still fails it, so it is not a
no-op.

Traceability threshold: MIN_THRESHOLD sat at 50 while real coverage was
86%, so nearly half the matrix could rot before the gate objected.
Ratcheted to 82 with the policy written down — it only ever goes up, and
is never lowered to make a red build pass. The same figure lives in
MIN_COVERAGE_PERCENT so `traces:coverage` gates locally on the same bar,
and a test fails if the two drift.

Dangling IDs: a TRACES comment could name any well-formed ID and the
extractor accepted it silently, so typos and renames that missed a call
site passed unnoticed. `bun run traces:validate` cross-checks every
traced ID against the table rows in requirements.md and fails with the
referencing files listed. It spans UT/IT as well, which the coverage
orphan list ignores by design. This currently reports DR-189 and UT-188,
which are being defined separately.

Flaky offlineCatalog test: the first dynamic import of the service paid
~1s to transform its dependency graph, charged to a test body against
vitest's 5s default. Alone it passed; under suite-wide contention it
timed out. The import is now warmed at collection time, so no test is
timing the compiler — the timeout is deliberately unchanged. The store
shim also drops subscribers from module instances discarded by
resetModules, which previously leaked across tests.
2026-08-16 22:51:44 +02:00
dtourolle 0da0a9f16c fix(ci): derive traceability denominators from requirements.md (DR-093)
The coverage gate divided traced counts by hardcoded literals (UR/39,
IR/24, DR/48, JA/3, TOTAL_REQS=114) that had fallen out of date as
requirements grew to 211. It reported 158% coverage — JA alone printed
800% — so the 50% threshold was mathematically unreachable and the job
could not fail. Coverage could have collapsed to 30% and CI would still
have printed a green tick.

Real coverage is 86%. The number was fine; the gate was dead.

extract-traces.ts now owns both sides of the fraction:

- countDefinedRequirements() counts an ID only where it leads a markdown
  table row, ignoring the "Traces To" column and prose. IDs are
  deduplicated because requirements.md lists every UR twice (§1
  definition + §3 matrix), which would otherwise report UR as 121/61.
- computeCoverage() uses the intersection of traced and defined IDs, so
  a TRACES comment naming a deleted or typo'd requirement is reported as
  `orphaned` rather than inflating the ratio past 100%. UT/IT test
  identifiers are excluded as a separate taxonomy.
- CI reads .coverage.percent and fails on <50% or >100%; a >100% reading
  is now a hard error rather than the condition that hid this bug.
- New `bun run traces:coverage` runs the same computation locally.
- scripts/ added to the scan roots — the coverage tool was invisible to
  the matrix it generates.

Tests written first (15, over fixtures so they don't drift as
requirements are added). vitest include widened to scripts/** so build
tooling is covered by the normal suite.

Verified empirically rather than by inspection: forcing the threshold to
99% fails; adding a requirement lowers coverage 86%→85%; a TRACES: DR-999
lands in `orphaned` without changing `covered`.

traceability-ci.md documented the same stale numbers and would have let
the broken arithmetic be reconstructed — replaced with a pointer to the
live command.
2026-07-30 10:30:08 +02:00
dtourolle bebe13eb62 ci: drop redundant setup-bun step that stalls Gitea runner
🏗️ Build and Test JellyTau / Run Tests (push) Successful in 4m59s
Publish Documentation / Build & publish docs to gitea-pages (push) Failing after 5m23s
Traceability Validation / Check Requirement Traces (push) Successful in 15s
Build & Release / Run Tests (push) Successful in 5m5s
🏗️ Build and Test JellyTau / Android Compile Check (push) Successful in 4m41s
Build & Release / Build Linux (push) Successful in 17m20s
Build & Release / Build Android (push) Successful in 22m29s
Build & Release / Create Release (push) Successful in 5s
bun is already baked into the jellytau-builder image (Dockerfile.builder),
so oven-sh/setup-bun@v1 was redundant. Fetching that GitHub-hosted action
from the self-hosted Gitea runner hangs the job before any steps run.
Removed from traceability-check, traceability, and publish-docs workflows;
build-and-test and build-release never used it and never stalled.
2026-07-23 09:45:07 +02:00
dtourolle dcf08f30bc fix: Autoplay now resets time to zero and ignores trigger if episode already started (#3)
🏗️ Build and Test JellyTau / Run Tests (push) Successful in 3m48s
Traceability Validation / Check Requirement Traces (push) Successful in 22s
Build & Release / Run Tests (push) Successful in 3m27s
🏗️ Build and Test JellyTau / Build Android APK (push) Successful in 18m31s
Build & Release / Build Linux (push) Successful in 15m52s
Build & Release / Build Android (push) Successful in 18m43s
Build & Release / Create Release (push) Successful in 12s
Reviewed-on: #3
Co-authored-by: Duncan Tourolle <duncan@tourolle.paris>
Co-committed-by: Duncan Tourolle <duncan@tourolle.paris>
2026-06-23 21:12:01 +00:00
dtourolle 55f1b85f12 Fix CI
🏗️ Build and Test JellyTau / Run Tests (push) Successful in 7m4s
Traceability Validation / Check Requirement Traces (push) Failing after 24s
🏗️ Build and Test JellyTau / Build Android APK (push) Failing after 2m5s
2026-06-20 17:51:58 +02:00
dtourolle 0738ef10ec More clean up
Traceability Validation / Check Requirement Traces (push) Failing after 4s
🏗️ Build and Test JellyTau / Run Tests (push) Failing after 8m52s
🏗️ Build and Test JellyTau / Build Android APK (push) Has been skipped
2026-06-20 15:38:26 +02:00
dtourolle 8f1c4bc9da correct CI tag
Traceability Validation / Check Requirement Traces (push) Failing after 12s
🏗️ Build and Test JellyTau / Build APK and Run Tests (push) Has been cancelled
2026-02-14 09:13:59 +01:00
dtourolle dbcaa1a1a5 more checks and updated pipeines
🏗️ Build and Test JellyTau / Build APK and Run Tests (push) Has been cancelled
Traceability Validation / Check Requirement Traces (push) Has been cancelled
2026-02-14 09:11:22 +01:00
dtourolle e3797f32ca many changes
Traceability Validation / Check Requirement Traces (push) Failing after 1m18s
🏗️ Build and Test JellyTau / Build APK and Run Tests (push) Has been cancelled
2026-02-14 00:09:47 +01:00