Files
scene-actor-extraction/docs
dtourolleandClaude Opus 5 43d2c976c3 docs: replace phased plan with a per-requirement one
The phase structure encoded ordering assumptions that stopped being true as the
design changed, and its Phase 2 still described retuning constants that are now
withdrawn. Ordering is now derived from per-requirement dependencies instead:
anything with no unmet dependency is startable.

Carries over the TrackRegistry design (now keyed to AR-012/AR-013) and records
what was withdrawn from the old plan, including the --presence-mode flag —
comparison against old behaviour uses recorded reference output rather than a
second live code path.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-30 17:36:09 +02:00
..